Student halls get upgraded with colour

Tags:   |   Added:

Worked exactly to the clients specification but at a cheaper price.

When VEKA Approved Installer D&M Windows and Doors won the contract to put windows into a timber framed building, the first challenge was to avoid the woodgrain texture.

That was no problem for trade fabricator Glazerite Windows Ltd and VEKA however and, while the contract presented other technical challenges, the flat untextured RAL 7016 anthracite grey foil profile was produced as a special order to fabricate the windows as specified for The Edge, a five-storey student accommodation block in Liverpool city centre.

Mark Hoolickin, Managing Director at D&M explained: “We had worked with timber constructions before so we knew about the allowances that need to be made for expansion at each floor level. But we were very glad when VEKA and Glazerite were able to come up with the smooth foil. Grey is very popular, especially with commercial clients but it’s more commonly on grained foil, though we have worked with the smooth grey on other locations where they wanted the same aluminium look.”

VEKA Commercial Development Manager Colette Hunter explained that the smooth grey was chosen to resemble powder coated aluminium, which had been the client’s first choice: “But when we were able to show them the cost difference and let them see the product for themselves, 

they went for PVC-U in all the courtyard areas while keeping aluminium on the front elevation.”

Oldham-based D&M, run by Mark and son Darren, installed 127 tilt/turn windows in VEKA Matrix 70 with Maco concealed gearing, fabricated by Glazerite at its North West Division in Bolton. Windows and panels were separated with the VEKA vertical expansion system. The main contractor was Beardsley Construction.

D&M had the support of the VEKA Commercial Team from the beginning, working with the planners at Liverpool City Council and providing technical details such as wind loadings. 

Peter Smith, Glazerite quotes: "Once again, this contract shows what can be achieved when installer, fabricator and system supplier work together as a team. D&M had the experience with timber buildings, not to mention an excellent track record on commercial projects of all kinds, and VEKA came up with the special order on the foil and the technical support".

Recent Case Studies

Burlington House & Siemens Office
Oldham-based D&M Windows & Doors Ltd has recently completed two large commercial installations using windows and doors fabricated by The Glazerite UK Group Ltd. D&M Windows was appointed by contractors Brown & Bancroft to work on the Siemens office building in Congleton, thanks to their extensive experience across the North West. The transformation took 3 months to complete and involved the installation of 200 VEKA M70 windows in white, over four floors. Last month the installer also put the finishing touches on another office building, Burlington House in Liverpool using 500 VEKA M70 windows in anthracite grey with a white interior, all fabricated by Glazerite. "We pride ourselves on providing excellent customer service and pour 100% commitment into every job. Thanks to VEKA's profile system and fabricator Glazerite, we are able to achieve high standards on a range of jobs, from bespoke residential properties right through to large commercial installations like Siemens and Burlington House." - Mark Hoolickin - Managing Director, D & M Windows
  |   Tags: Commercial
Adeva Windsor House Project
Kent based Adeva Home Improvements has built on its recent success in large scale commercial window installation with a triple glazing retrofit for a sheltered housing scheme in Whitstable.  Once again, the group praised The Glazerite UK Group Ltd and VEKA for their support in specifying and completing the contract, for 279 casement windows in the VEKA 70mm fully sculptured system finished in white, at the 12-storey Windsor House. As with the previous installation, VEKA supplied the wind load calculations essential for installations at such hight, with other technical support by Glazerite, without which Director Geoff Dwyer said the company would not have had the confidence to tender for the work.  "They were with us all the way when we had the chance of our first large scale commercial contract. That gave us the confidence to continue our activity in the sector and the result was another success for us with Windsor House. The technical support from Glazerite and VEKA was brilliant, the clients are very pleased with the result and we are already looking at several more prospects." Elderly residents at Windsor House were finding the first generation double glazed PVC-U had become draughty as well as making the flats costly to hear in cold weather. Adeva replaced them with far more energy-efficient A+Rated, triple glazed VEKA 70FS units, for main contractor Hamilton Building Contractors.  Jason Thompson, Director of The Glazerite UK Group, said the installation was another model example of what installers of any size can achieve with the right materials and the right technical support: "Most good installers are perfectly capable of carrying out such medium and even large scale commercial contracts but may be put off by the technical back-up and specification advice. But all Glazerite installer partners know that all you need is a good, supportive fabricator and system supplier and they can achieve virtually anything."
  |   Tags: Energy Efficiency, VEKA, Commercial
Wimbledon Park Estate Refurbishment
It's a tough decision for any SME - risk stepping up to your biggest contract ever or to play safe and lose out on a big chunk of business. But it was less of a dilemma for Kent-based Adeva Home Improvements because, as Director Geoff Dwyer explained, the backing of the Glazerite UK Group, as well as VEKA, was crucial in tackling the job. We might otherwise have had serious doubts about taking it on". he said after completing the installation of nearly 3,000 windows and doors as part of a £2.2 million refurbishment of Wandworth's Wimbledon Park Estate. "But Glazerite was with us all the way. We've been working with them for about six years, and VEKA much longer. We knew the product and the customer service. Glazerite were very supportive; they were up to speed on manufacture and delivery and, just as important, if any problem arosem, they would be there to rectify straight away." The job was not without challenges, he continued, firstly in removing the original Crittal steel frames, which were not only set into concrete but many had to be taken out in a single three metre by two-metre piece.  Also, the new frames were an unusual combination of side-hung casement and tilt/turns which might have been a problem for some fabricators, though Glazerite took them in its stride. Adeva installed the A-Rated, SBD specification windows and doors based on the VEKA M70 system in white, for main contractor Mulalley and Company Ltd of Woodford Green on behalf of the London Borough of Wandsworth. VEKA also carried out the wind load calculations for the design specification.  Geoff Dwyer concluded: "This was a very substantial piece of work, and by far our biggest contract to date. But we may well have had to think twice about going for it had it not been for the support we got from Glazerite".
  |   Tags: VEKA, Glazerite, Commercial, Installers

Check out the latest news from Glazerite regarding installations, products and the latest news  
Product demonstrators, security testing and information videos, you'll find it all in this section.
We have a wide range of case studies available, in this section you'll find a few of them.    

Learn more about how Glazerite can help your business grow with one of the most comprehensive product portfolios and support packages in the industry.

The Glazerite UK Group Ltd manufacture and supply uPVC Windows, Doors and Conservatories to trade customers from sites in the Midlands, Northwest, East and Southwest.

© Glazerite 2018     -     Privacy Policy     -     Site by Verto