Trade Commercial Homeowners
Call us today 01933 443 222 Login

Mill renovation for University

Tags: Glazerite, Commercial, Installers   |   Added:

K2 Aluminium Systems, an installer of the Glazerite UK Group recently completed a redevelopment project in Halifax for Leeds Beckett University Business Centre. 

The project consisted of 125 windows as part of the larger multi-million pound transformation programme on the old weaving mill located on Horton Street in Halifax. 

The architectural aluminium specialist installed VEKA’s M70 frames in grey, which were manufactured by Glazerite’s Bolton Division.

Sales Manager for Glazerite, Pete Smith, explains: “The Matrix 70 system, characterised by its 5 chambers and clean chamfered lines, provides a modern, energy efficient solution that looks equally at home when used for new build projects or refurbishment projects such as this one. The required styles looked complex in design but were easy to manufacture thanks to our state-of-the-art multi-headed welding and cleaning facilities. 

“K2 needed a quick turnaround to fulfil their tight fitting schedule, installing a floor per week to meet the completion deadline, and our nationwide coverage meant we could deliver as and when required.

 “The frames themselves were matched to the original timber window style to keep in touch with its period façade, and this project is another great example of thermally efficient, modern materials being used to allow a historic building to live on for many years to come.” 

As part of its partnership with Calderdale Council, Leeds Beckett University is launching a new initiative to drive growth amongst early-stage and growing businesses. The University Business Centre will be based at Piece Mill in Halifax, next to historic Piece Hall, and will re-open later this year. 

Piece Mill is an impressive converted mill providing open plan, affordable office and meeting space plus a range of business support in the centre of Halifax. The centre is part of a network of Leeds Beckett University Business Centres that have been operating for more than 15 years. Over 200 businesses across the region are currently located in Leeds Beckett’s private, shared and co-working spaces which to date have supported over 800 businesses to accelerate their growth. Support from Leeds Beckett has been proven to almost double business sustainability, with a 95% business survival rate in the first year of trading. To find out more please visit www.leedsbeckett.ac.uk/halifaxbusinesscentre.

The Glazerite UK Group is one of VEKA’s leading trade fabricators in the UK and a long-standing Network VEKA and Independent Network member. It offers a fully nationwide service based on manufacturing units in Northants, Peterborough and Greater Manchester. South Wales and the West of England are served through the South West distribution hub in Bristol. 

Recent Case Studies

Transformation of Burlington House
Oldham-based D&M Windows & Doors Ltd has recently completed the transformation of a Liverpool office building using windows fabricated by The Glazerite UK Group Ltd. VEKA Installer, D&M Windows completed the 7,786 sp ft Burlington House development in Crosby in October 2018. In their first job for Amspec Ltd, D&M Windows installed over 500 VEKA M70 windows in Anthracite Grey, with a white interior. The project took just under five months to complete.  Run by father and son team, Mark and Darren Hoolickin, D&M Windows prides itself on providing excellent customer service. Mark says: "The install was a big job but we were able to achieve a high quality install thanks to the supply and fabrication of the excellent M70 product from VEKA and Glazerite" "The final result looks stunning and the Anthracite Grey really gives the building a distinctive edge. We're pleased to have been able to play a part in this project and work once again with the team at D&M Windows." - Peter Smith, Area Sales Manager - Glazerite UK Group  
  |   Tags: Commercial
70's office block transformation by D&M Windows
Offices housing employees of the industrial manufacturer, Siemens, have undergone a huge facelift thanks to the Glazerite UK Group Ltd and their customer, D&M Windows Ltd.  Oldham's D&M Windows was chosen by contractors Brown & Bancroft to carry out the transformation of the four storey building in Congleton, Cheshire, because of their extensive experience in commercial and domestic installations. Glazerite fabricated and supplied over 200 VEKA M70 windows in white for the install, which took three months to complete.  Mark Hoolickin, who runs D&M Windows with his son, Darren, says: "As a family-run business we always want to ensure that every customer receives the very best. Thanks to VEKA and Glazerite, we were able to achieve everything Siemens wanted, and we've since been contacted by them to install new windows on their manufacturing units." "We've worked with D&M Windows for a number of years, supplying windows and doors for bespoke domestic projects through to large commercial installs like this one. Their work is always of the highest quality and we're delighted to have been able to work with them on this prestigious project." - Peter Smith, Area Sales Manager North West - Glazerite UK Group
  |   Tags: Commercial
Adeva Windsor House Project
Kent based Adeva Home Improvements has built on its recent success in large scale commercial window installation with a triple glazing retrofit for a sheltered housing scheme in Whitstable.  Once again, the group praised The Glazerite UK Group Ltd and VEKA for their support in specifying and completing the contract, for 279 casement windows in the VEKA 70mm fully sculptured system finished in white, at the 12-storey Windsor House. As with the previous installation, VEKA supplied the wind load calculations essential for installations at such hight, with other technical support by Glazerite, without which Director Geoff Dwyer said the company would not have had the confidence to tender for the work.  "They were with us all the way when we had the chance of our first large scale commercial contract. That gave us the confidence to continue our activity in the sector and the result was another success for us with Windsor House. The technical support from Glazerite and VEKA was brilliant, the clients are very pleased with the result and we are already looking at several more prospects." Elderly residents at Windsor House were finding the first generation double glazed PVC-U had become draughty as well as making the flats costly to hear in cold weather. Adeva replaced them with far more energy-efficient A+Rated, triple glazed VEKA 70FS units, for main contractor Hamilton Building Contractors.  Jason Thompson, Director of The Glazerite UK Group, said the installation was another model example of what installers of any size can achieve with the right materials and the right technical support: "Most good installers are perfectly capable of carrying out such medium and even large scale commercial contracts but may be put off by the technical back-up and specification advice. But all Glazerite installer partners know that all you need is a good, supportive fabricator and system supplier and they can achieve virtually anything."
  |   Tags: Energy Efficiency, VEKA, Commercial

Check out the latest news from Glazerite regarding installations, products and the latest news  
Product demonstrators, security testing and information videos, you'll find it all in this section.
We have a wide range of case studies available, in this section you'll find a few of them.    

Learn more about how Glazerite can help your business grow with one of the most comprehensive product portfolios and support packages in the industry.

The Glazerite UK Group Ltd manufacture and supply uPVC Windows, Doors and Conservatories to trade customers from sites in the Midlands, Northwest, East and Southwest.

© Glazerite 2018     -     Privacy Policy     -     Site by Verto